Engineering Building Construction

February 1998

1: View of caisson drilling from 4th floor of old Broadcast Services area.
2/25/98
2: Excavation for new lecture hall.
2/25/98
3: Contractor supervises caisson drilling.
2/25/98
4: The hole is deep, but substantially less than anticipated due to depth of rockbed
2/25/98
5: Driving the drilling rig.
2/25/98
6: Shive-Hattery engineer inspected bore depth.
2/25/98
7: Site contrinues to be prepared, even as drilling is started.
2/25/98
8:
2/25/98
9: Total System .008" accuracy
2/24/98
10: Digging Caissons
2/24/98
11: Yard Bucket
keeps 5 trucks busy
2/24/98
12: Construction Zone
2/24/98
13: Excavating for shoring
2/10/98
14: Pumping concrete
into shoring tieback.
2/17/98
15: H beam 6' on center,
3"X10" wood
cross-sheathing
2/17/98
16: Wall
2/20/98
17: Doors to two new classrooms(Old 3407)
2/20/98
18: Area Maintenance shop(old 1403EB)
2/20/98
19: Crane
2/17/98
20: Crane
2/17/98
21: Crane
2/17/98
22: Concrete
2/17/98
23: Wall
2/17/98
24: Room
2/17/98
25: Shovel
2/17/98
26: Shovel
2/17/98
27: Connecting
2/10/98
28: Hallway
2/10/98
29: to New Building
2/10/98
30: Rubble removal
2/10/98
31: 3407 EB Auditorium
2/10/98
32: Excavator
2/10/98
33: Contractors
2/10/98
34: Historical find
2/10/98
35: Off-loading rebar 2/6/1998 36: Rebar 2/6/1998
37: Rebar 2/6/1998 38: Setting Steel 2/6/98 39: Piers for shoring 2/6/98 40: CEE Hard Hat Zone 2/6/1998
41: Brian answers fire alarm 2/6/98 42: Pier Drilling 2/6/98 43: Setting Pier 44: Television Landmark
45: Crane (2/5/98) 46: Truck (2/5/98) 47: 3407 Demo 2/5/98 48: Radio Station Demo 2/5/98
49: Prof. McCauley 2/5/98 50: Crane 2/5/98 51: First Concrete 2/5/98 52: Shovels 2/5/98